| 1. | Deck flushing piping system to be done air - tightness test 甲板冲洗管系密性试验。 |
| 2. | Painting rm . fire fighting pipe to be done air - tightness test 油漆间消防管系密性试验。 |
| 3. | Test methods for cable accessories . part 4 : tightness test 电缆附件试验方法.第4部分:压力密封试验 |
| 4. | Ref . freon piping to be done air - tightness test and vacuum test 冷藏氟利昂管系密性试验和真空试验。 |
| 5. | Air tightness test for auxiliary boiler ( economize boiler ) on board 辅锅炉(废气锅炉)装船后气密试验。 |
| 6. | Cleaning and tightness test should be done about correlation piping 3相关管路清洁完毕,并经过密性试验、验收结束。 |
| 7. | Non - destructive testing - terminology - terms used in leak tightness testing 无损检验.术语.第8部分:防漏泄试验用的术语 |
| 8. | Tightness test of air box 空气箱密性试验 |
| 9. | Non - destructive testing . terminology . part 8 : terms used in leak tightness testing 无损检测.术语.第8部分:渗漏密封试验术语 |
| 10. | Non destructive testing . tightness testing . testing by accumulation or sniffing of gas 无损检验.密封性试验.用蓄气或吸气进行检测 |